Free consultation and roadmap guidance for first-time founders. Talk your first product idea through with our engineers.Get my free consultation →

DRAM Prices 2026: What the Memory Shortage Means for Your Device

DRAM contract prices rose 93 to 98 percent in Q1 2026 as AI data centers pull memory capacity away from consumer devices. Here is what that means for your BOM, how long it may last, and how to design around it.

Key takeaways

  • DRAM contract prices rose 93 to 98 percent in Q1 2026 alone, driven mainly by AI data centers pulling memory capacity away from consumer and commodity devices.
  • Memory now makes up a far larger share of device bill of materials than it did a year ago: HP reported memory at roughly 35 percent of PC build cost in early 2026, up from 15 to 18 percent the prior quarter.
  • Analysts and chipmakers disagree on exactly when supply loosens, with forecasts ranging from 2028 to the early 2030s, so a design locked to 2025 memory pricing is already out of date.
  • Teams that qualify more than one memory part now, or check whether a cheaper on-chip alternative covers their real requirement, are in a better position than teams locked into a single part number.

DRAM prices in 2026 are sharply higher than a year ago because AI data centers are buying memory faster than manufacturers can add capacity, and the increase is large enough to change a hardware product’s bill of materials. Digital Trends, citing TrendForce and other industry data, reported conventional DRAM contract prices up 93 to 98 percent in Q1 2026 alone, with a further 13 to 18 percent quarter-over-quarter rise in conventional DRAM forecast for Q3. For a device with a meaningful DRAM or NAND component, that changes which memory part a design can still afford.

Why DRAM and NAND got this expensive in 2026

The shortage traces back to how manufacturing capacity gets allocated, not a sudden drop in output. Data centers consumed roughly half of global DRAM supply in 2025, up from about 32 percent five years earlier, and AI servers are on track to exceed 60 percent of DRAM consumption by 2030, per Bloomberg’s reporting on the memory market. High-bandwidth memory for AI accelerators uses about four times the cleanroom capacity per gigabyte of standard DRAM, per CSIS analysis, so every wafer shifted to HBM production does not become consumer-grade memory. Samsung, SK Hynix and Micron held about 90.5 percent of DRAM sales in Q4 2025, leaving little spare capacity elsewhere. A single customer can move the whole market: OpenAI reportedly signed letters of intent in October 2025 for its Stargate project that could consume up to 40 percent of global DRAM output, and Amazon, Microsoft and Meta have been reported placing similar open-ended orders at whatever price it takes.

Free template: every hardware cost from idea to first production run, with typical ranges →

How much memory prices have actually moved

Metric Change Source and date
DRAM contract price, Q1 2026 Up 93 to 98 percent Digital Trends, citing TrendForce (September 2026)
DRAM and NAND contract prices, Q3 2026 forecast Conventional DRAM up 13 to 18 percent, NAND up 10 to 15 percent, quarter over quarter TrendForce, July 2026
Average NAND price per terabyte, 2026 vs. 2025 $279.50 projected for 2026, up from $73.10 in 2025 BNP Paribas, reported September 2026
Memory’s share of PC build cost Roughly 35 percent, up from 15 to 18 percent the prior quarter HP, reported early 2026

These are dated, scoped figures, not one universal percentage. DRAM and NAND moved differently, and spot and contract pricing moved differently again. Check what product, quarter and price type any figure describes before you put it in your own budget.

What this means for your device’s bill of materials

The effect shows up first where memory was already a large share of cost. Fairphone’s chief executive has said, per Digital Trends’ reporting, that memory can make up almost 60 percent of the bill of materials on a phone priced around $400. IDC says the sub-$100 phone tier, which shipped over 170 million devices in 2025, is becoming economically unviable, and in May 2026 it forecast global smartphone unit shipments down 13.9 percent in 2026 even as total market value edges up because selling prices rise to absorb the cost.

Smaller hardware makers are not waiting this out. Digital Trends profiled real changes already in place: Jolla designed two motherboard variants so it can switch between a combined memory package and individual chips depending on what is available. Framework now places non-cancellable memory orders earlier than it used to, before final price or delivery is confirmed, and lets customers install memory salvaged from older machines. Micron has signed Strategic Customer Agreements with automotive suppliers including Qualcomm and Denso to give them pricing and supply visibility, a model worth asking your own suppliers about even at a smaller scale.

How long the shortage is expected to last

Forecasts disagree on the date, and that spread is itself useful for planning. Intel has said there is no relief expected until 2028, per Bloomberg. SK Hynix’s chief executive told Reuters in July 2026 that the company expects 2027 to be the industry’s worst year for supply, with demand exceeding capacity even beyond 2030, a statement that came the same day as the company’s Nasdaq listing. A separate Kearney analysis, reported in May 2026, projects the shortage lasting at least until 2030. None of the credible forecasts puts relief solidly behind us before 2027 or 2028 at the earliest, so a schedule assuming memory returns to 2024 pricing before your product ships is not safe.

Designing around the price, not just paying it

Some of this exposure is avoidable at the design stage. In our experience at Inventornest, component procurement is already a major source of schedule pressure on hardware programs, and we account for sourcing risk when selecting components rather than locking onto a single part. We also avoid relying on a component available from only one vendor wherever practical, checking availability across multiple suppliers before a design is finalized.

  • Qualify at least one alternate memory part at the schematic stage, not after a board is already in production.
  • Check whether your microcontroller’s internal memory covers your real requirement before defaulting to external DRAM because an earlier design used it. For AI-capable products specifically, see our guide to choosing an AI chip for a product.
  • Price your bill of materials from current supplier quotes, not a figure from six months ago. Our guide to target costing for hardware covers working a BOM ceiling backward from your target shelf price, which matters more when one line item is this volatile.
Free templateBudgeting a hardware product? Start with every line.Every cost from feasibility to first production run, with typical ranges and the costs founders leave out. Read it free on the page, or download the PDF.
See the budget lines →

Frequently asked questions

Why did DRAM prices rise so much in 2026?

AI data centers are consuming a rapidly growing share of global DRAM and shifting manufacturing capacity toward high-bandwidth memory for AI accelerators, leaving less conventional DRAM and NAND for consumer and commercial devices even though overall output has not collapsed.

How much have memory prices actually gone up?

Digital Trends, citing TrendForce and other industry data, reported DRAM contract prices up 93 to 98 percent in Q1 2026, with a further 13 to 18 percent quarter-over-quarter rise in conventional DRAM forecast for Q3. NAND and specific product categories have moved by different amounts, so the right figure depends on what you are pricing.

When will memory prices come back down?

Forecasts range from no relief before 2028, per Intel, to the shortage lasting into the early 2030s, per one chipmaker’s own executive and a separate industry analysis. None of the credible forecasts points to relief any sooner than that.

Does this only affect large companies buying huge volumes?

No. Digital Trends profiled independent makers such as Jolla and Framework already changing board designs and ordering practices, and Fairphone’s chief executive has said memory can reach almost 60 percent of the bill of materials on a mid-priced phone.

Should I redesign my product around less memory right now?

That depends on your actual requirements, not the price alone. Qualifying a second source for your current part and re-checking whether your real function needs as much memory as the design currently uses is usually more useful than a reactive redesign under schedule pressure.

Does this affect NAND flash too, or only DRAM?

Both. TrendForce has reported contract price increases across DRAM and NAND through 2026, though the percentage differs by product and quarter, and NOR flash and SLC NAND used in many embedded devices have seen some of the steepest increases.

Where Inventornest fits

Component procurement risk is something we plan around at Inventornest rather than treat as a surprise mid-project. We include schedule slack and account for sourcing risk when selecting components, and we prioritize market-available parts rather than assume a part chosen today stays affordable or available by the time a design reaches manufacturing.

If you are scoping a new product and want its bill of materials checked against current component realities before you commit to a design, get a quote, or see completed engineering work in our portfolio. Our outsourced product development services cover this kind of sourcing-aware design work as part of a full engagement.

Not sure what comes next?

Describe your product and we will tell you honestly which stage comes next, and what it would cost.

Book a consultation
Every engagement begins under NDA, and you retain full ownership of the resulting IP. Exactly what is delivered, and in which formats, is set out in the agreed scope.
Muhammad Mohsin Aslam, Founder and CEO of InventornestWritten byMohsin Aslam

Electrical engineer and Founder & CEO of Inventornest. He leads an in-house team covering industrial design, mechanical engineering, electronics, embedded firmware and manufacturing.

On this page

Book a consultation

Tell us what you are building. We will tell you which stage comes next.

Book now

Bring us the idea. We will tell you what it takes to build it.

Feasibility analysis, prototyping, design for manufacturing and certification, from one in-house team.

Book a Consultation
Keep reading

Related guides